Suez port is situated on the southern end of Suez canal, approximately170 km south of Port Said.
Latitude :57 29' N        Longitude: 33   32' E
 

Approach area

 

Ships usually berth in the waiting area. The channel has been shoveled at port El Sakhra El Gadida and coastal pier at relevant depth 11.28 m. Ships, whose draft exceeds 11.28m, can enter the port during the tide only on condition that the draft does not exceed 12.19m


 

 

 

1-

Port Dues

= GRT X 0.25 

USD

2-

Light Dues

= GRT X 0.1 

USD

3-

Berthing Dues

= GRT X 0.0125 X No. of Days  

USD

4- TUGs 275$ per tug / hour for minimum 3 hours Discount of 50% to be granted.

 

Number of TUGs used depends on vessel's length over all as follows:

 

L.O.A

No. of Tugs

Less than 200 ft

Nil

200 ft - 300 ft

1

More than 300 ft

2

 

 

5- Pilotage Dues from the outer anchorage to the berth or vice versa as per the

    following table:

 

a) From outer anchorage to the berth or vice versa:

Vessel's GRT

USD

UP TO 999

90

1000 4999

150

5000 9999

209

10000 19999

294

20000 29999

387

30000 39999

514

40000 49999

578

50000 59999

610

60000 AND UP

717

 

b) Outside Sea pilot:

Vessel's GRT

USD

UP TO 999

50

1000 4999

98

5000 9999

131

10000 19999

196

20000 29999

271

30000 39999

343

40000 49999

363

50000 59999

370

60000 AND UP

437

 

C) Inside port and basins:

Vessel's GRT

USD

UP TO 999

40

1000 4999

52

5000 9999

78

10000 19999

98

20000 29999

116

30000 39999

170

40000 49999

215

50000 59999

240

60000 AND UP

280

- 50% to be added to the above rates in case of working during night time/holiday

 

6- Mooring and Unmooring 220$

 

N.B.
    20% to be added to the above rates in case working after office hours and 50 % in case working

    on Fridays and official holidays.

 

7- Official Agency  Fees
    (Payable to Maritime Sector) 


A) Basic fees

 

GRT

 USD 

Up to 3000  

250.00 

>3000 up to 5000

300.00 

>5000 up to 10000  

400.00

>10000 up to 20000   

500.00 

>20000 up to 40000  

600.00

>40000 for each 10000  

50.00

 

For Passengers & Cruise ships: 
    Up to 15000      400.00          
   
> 15000           600.00         
 
Other floating units: 

    - Yachts > 60 m LOA    90.00   
    - Towage units            200.00     

 
B) Additional fees 

 
The rates indicated in the item (A) are applicable for the first 5 days stay, USD 25.00 will be added per any extra day.



General Conditions

- The Yachts up to 60.00 m LOA to be exempted from the official agency fees
-
 Rebates of 50% to be granted for Passengers & Cruise ships of LOA>60m.
-
 The above fees are payable in USD for the foreign vessels.
-
 The above fees are payable in L.E. for the Egyptian vessels with the rates on the basis of that

   the USD is equal L.E..
 

Note:

  The above items does not include other port Expenses (permit of departure, over time, port

  police, quarantine, immigration, cleaning,...etc


 

 